Development of the Oil and Gas Fields' Cluster in the Pechora Sea
Master thesis
Permanent lenke
https://hdl.handle.net/11250/2678550Utgivelsesdato
2020Metadata
Vis full innførselSamlinger
Sammendrag
The Master Thesis aims to develop a cluster oil and gas fields development concept in the Pechora sea and carry out an economic feasibility estimation of this concept.
The first chapter describes the climatic conditions of the Pechora Sea. The geographical characteristics and characteristics of hydrometeorological and ice conditions are under consideration.
The second chapter introduces the main challenges linked with offshore arctic oil and gas fields’ development.
The third chapter presents the selection of a field-group for a cluster development consideration. After that, the design of the development concepts for the selected group of fields was carried out. The chosen fields are Dolginkoye, North-Gulyaevskoye and Pomorskoye oil and gas/condensate fields. The production profile for each field and the total production profile have been plotted.
The fourth chapter presents the infrastructure choice for the chosen cluster development concept: the choice of a gravitational-type platform design; selection of an LNG plant and natural gas liquefaction technology; selection of subsea production systems; choice of a loading and shipment method of carriers for transportation of extracted products.
In the fifth chapter, the concept's economic feasibility and the further selection of the most cost-effective concept was under consideration.
Beskrivelse
Master's thesis in Offshore technology
Utgiver
University of Stavanger, NorwaySerie
Masteroppgave/UIS-TN-IMBM/2020;Beslektede innførsler
Viser innførsler beslektet ved tittel, forfatter og emneord.
-
Evaluation of the primary cement operation on the production casing in the Ekofisk field and the Eldfisk field
Mikalsen, Ann Elin (Masteroppgave/UIS-TN-IPT/2009;, Master thesis, 2009)The foremost goal of primary cementing is to provide zonal isolation in a well. Cementing of the casing/liner set right above the reservoir on the Ekofisk and Eldfisk fields are associated with a lot of challenges. ... -
Field development of a marginal oil field on the Norwegian Continental Shelf
Rasmussen, Victoria (Masteroppgave/UIS-TN-IKM/2015;, Master thesis, 2015-06-15)A small model oil field Tesla has been created based on assumptions and data from an existing field. With a lifetime of 8 years and expected total production of 8 million Sm3 oil, it is a marginal development, where the ... -
Time dependent signal of a chalk field: The South Arne Field, Danish North Sea
Tomasgaard, Mathias (Masteroppgave/UIS-TN-IER/2018;, Master thesis, 2018-06)Time-lapse seismic analysis is applied to a producing chalk field, with the aim to understand the field time-varying behaviour with respect to reservoir structure and fluid migration. The study area is the South Arne field ...