Development of the "Tsentralnoye" offshore field
Description
Full text not available
Abstract
In this master thesis, the development strategy of the Tsentralnoye field and the facility infrastructure scheme were introduced. According to an oil development scenario, the main field development parameters of the Tithonian deposit were calculated. The best field development option has been selected in terms of maximum oil recovery factor. The internal diameters of subsea in-field and trunk pipelines were determined. Several designs of the offshore floating structure and manufacturing capability in the Caspian region were analyzed. The selection criteria for the offshore platform were introduced. The subsea production system and the oil-gas processing method were described.