Blar i Studentoppgaver (TN-IKM / TN-IMBM) på emneord "NORSOK"
Viser treff 1-4 av 4
-
Development of FMEA/RCM methodology to be implemented in Generic Maintenance Concepts
(Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012)This master thesis has developed methods for how to interpret failure data and incorporate these into OIA's existing database. This also gave input to improvement of OIA's existing software Kamfer to develop more functionality ... -
Permanent Plugging and Abandonment - An identification and discussion of technologies and the differences in UKCS and NCS regulations
(Masteroppgave/UIS-TN-IKM/2017;, Master thesis, 2017-06)There is a large number of wells on the Norwegian Continental Shelf that need to be permanently plugged and abandoned (P&A) within the next decades. As P&A does not provide any income, it is very important to develop ... -
Reliability centred maintenance of Electric Overhead Traveling (EOT) cranes installed in the well intervention area: A case study for ConocoPhillips
(Masteroppgave/UIS-TN-IMBM/2018;, Master thesis, 2018-06-15)Material handling equipment is vital for support functions for oil and gas production facilities. On a production platform, cranes are mounted in several areas. E.g. for handling load between supply vessels and platform, ... -
Structural resistance safety level in Eurocode versus NORSOK and ISO
(Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012-06-14)The objective of this thesis is to analyze and compare the capacity limits, hence the inherent safety level for the actual structure, using various standards and regulations such as Eurocode, NORSOK and ISO. The main tool ...