• Analysis of cable vibrations at Stavanger City bridge 

      Sørvåg, Kari Elise (Masteroppgave/UIS-TN-IMBM/2019;, Master thesis, 2019-06-14)
      After the opening of the cable-stayed bridge Stavanger City Bridge in 1978 there have been reports of vibrations of the stay cables. The bridge is 1066,6 m long, and has a main span of 185 m. The main span is supported by ...