Show simple item record

dc.contributor.authorVazquez Taboada, José
dc.date.accessioned2014-12-10T15:08:53Z
dc.date.available2014-12-10T15:08:53Z
dc.date.issued2014-04
dc.identifier.urihttp://hdl.handle.net/11250/226936
dc.descriptionStudent paper in Petroleum engineeringnb_NO
dc.description.abstractThe Johan Sverdrup field was discovered in 2010, formed by three blocks (PL 501, PL 265 and PL 502) on the North Sea, with an estimated of reserves between 1.8 billion to 2.8 billion Barrels of Oil, so assessing the total risk for this huge field development is crucial, as well as the understanding of the development of each phase. The launched Project, is structured by the consortium Group (Statoil ASA, Lundin Norway ASA, Maersk Oil ASA, Petoro AS and DNV GL AS). From Operation and Maintenance perspective, the Project carries critical operations and challenges in the long term (Interfaces, Power Network system, Pipeline Net Installation….etc) to be cover up through appropriate preventive maintenance management and control, during the estimated entered Life Cycle of the field(50 years).nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.subjectpetroleumsteknologinb_NO
dc.subjectpetroleumsindustriennb_NO
dc.subjectpipeline net installationnb_NO
dc.subjectJohan Sverdrup fieldnb_NO
dc.subjectquantitative risk assessmentnb_NO
dc.subjectreliabilitynb_NO
dc.subjectLCC analysisnb_NO
dc.subjectlife cycle analysisnb_NO
dc.titleDesign for operation and maintenance of the Johan Sverdrup oil and gas fieldnb_NO
dc.typeStudent paper, othersnb_NO
dc.subject.nsiVDP::Technology: 500::Rock and petroleum disciplines: 510::Petroleum engineering: 512nb_NO


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record