A Study of Possible Approaches for Considering Well Abandonment in the Well Design Stage
(Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06-13)There are many fields on Norwegian Continental Shelf (NCS) that approach end of their design life. Based on feasibility studies, life of some fields is prolonged while it is shortened for others. Since early days there ... -
Rigless Tubing Retrieval for Plug and Abandonment and Slot Recovery Operations on the Norwegian Continental Shelf
(Masteroppgave/UIS-TN-IEP/2019;, Master thesis, 2020-06-15)The conventional way of performing permanent P&A operations on the NCS have been with the use of a drilling rig. It is believed that this is not the optimal unit for the purpose, as they are costly to run with day rates ...