• Addressing zonal isolation challenges and improving 9 5/8" production liner primary cement jobs across the Valhall field 

      Idsø, Jone (Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-12)
      Placing cement in the annulus between a casing string and the borehole is essential to obtain compliant zonal isolation. Circumferentially bonded cement provide a hydraulic seal which prevents cross flow between permeable ...
    • Casing design evaluation for water injectors at Valhall 

      Norum, Espen (Masteroppgave/UIS-TN-IPT/2009;, Master thesis, 2009)
      The Valhall field is the largest field that BP operates on the Norwegian Continental Shelf, and is one of the most well known high porosity chalk fields in the Southern part of the North Sea. During many years of oil ...
    • P&A of Valhall DP wells 

      Njå, Nils Oskar Berg (Masteroppgave/UIS-TN-IPT/2012;, Master thesis, 2012)
      The original platforms on the Valhall field will have to be decommissioned due to integrity issues. The oldest drilling platform, Valhall DP, has 30 wells that must be P&A in order to remove the platform. This thesis ...
    • VRD plant performance testing project 

      Enerstvedt, Åsbjørn (Masteroppgave/UIS-TN-IKM/2010;, Master thesis, 2010)
      This master thesis is written on the subject of BP Norway’s installation of a new field centre (PH), at Valhall. The project, called Valhall Re-Development (VRD), needed to outline procedures on how to verify performance ...