• Analysis of cable vibrations at Stavanger City bridge 

      Sørvåg, Kari Elise (Masteroppgave/UIS-TN-IMBM/2019;, Master thesis, 2019-06-14)
      After the opening of the cable-stayed bridge Stavanger City Bridge in 1978 there have been reports of vibrations of the stay cables. The bridge is 1066,6 m long, and has a main span of 185 m. The main span is supported by ...
    • Dynamic response of a floating bridge under wind conditions from field measurements 

      Syper, Joanna; Zhao, Ran (Masteroppgave/UIS-TN-IMBM/2020;, Master thesis, 2020-06-28)
      The long and slender floating structures across the wide and deep waters are exposed for considerable environmental loads. In this study, the dynamic response of a curved floating pontoon bridge supported by side mooring ...