Now showing items 1661-1680 of 1788

    • Applications of a new framework for analyzing model output uncertainty in risk assessment 

      Bjerga, Torbjørn (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      The framework: In both papers we introduce the new framework for analyzing model (output) uncertainty in models used in risk assessment. The framework applies when no experimental data are available at the time of the ...
    • Efficiency of ICV/ICD systems 

      Gimre, Jeanette (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Well completions today are very different from the traditional well completions. Reservoir complexity has increased, making horizontal wells the optimal solution in many reservoir cases, and an increase in the use of ...
    • Der naboer møtes 

      Fosen, Cathrine (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      I denne oppgaven er det fokusert på hvordan Hemmingstad bydelssenter i Haugesund kan fungere som en møteplass der naboer møtes. For å tilrettelegge for et bydelssenter der den sosiale interaksjonen oppstår plutselig ...
    • Usikkerhetsstyring: forskjell på trussel og mulighetsorientering 

      Førland, Helge (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Oppgaven består av følgende kapitler: 3.0 Innledning: Jeg ønsker i denne oppgaven å rette søkelyset mot usikkerhetsstyring i prosjekter for å se hvordan en tar hensyn til de usikkerhetene en treffer på i en prosjektgje ...
    • Lean construction i Kruse Smith - involvering og effektivisering av underentreprenører ved Lyngdal ungdomsskole 

      Alic, Edi (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Prosjektet oppgaven omhandler er en ny ungdomsskole i Lyngdal som skal stå ferdig sommeren 2013. Prosjektet er en totalentreprise hvor totalentreprenøren er Kruse Smith AS i samarbeid med Asplan Viak som arkitekt og rådgiver, ...
    • Effective risk management SOGO life cycle management 

      Ali, Mohamed Omar (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      After new or upgrade projects the offshore installation gets maintenance or support through the life cycle management organization at Siemens. Small to medium modification projects are executed by the life cycle management. ...
    • Risikostyring - "the black swans" : en studie av det ukjente 

      Annerløv, Gustav (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Noen ulykker er av en slik art at det er ingen historiske data som kan fortelle om deres mulige eksistens på forhånd. De har ofte store eller katastrofale virkninger. I ettertid lar de seg imidlertid rasjonalisere, og de ...
    • Valg av utbyggingskonsept - platform eller undervannsløsning 

      Osmundsen, Petter (Journal article; Peer reviewed, 2011)
    • Rolle og funksjon til en fysisk barriere - lukedekk 

      Ørjasæter, Odd Peter S. (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Mellom bore- og brønnhodeområdene på faste oljeinstallasjoner er det plassert et lukedekk. Produksjon, boring og øvrige aktiviteter som kreves når man driver med utvinning av olje og gass krever at utstyr penetrerer dette ...
    • Implementing a barrier management system 

      Røssland, Espen (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Investigation of several accidents or near-misses in recent years has shown that there often is a clear causal relationship between a lack of control of the barriers and the final consequences of individual events on ...
    • Project Risk Management : a study on the risk management approach utilized by ConocoPhillips Capital Projects 

      Anders, Bjelland (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      The oil and gas industry on the Norwegian continental shelf is currently experiencing a record-breaking activity level and optimism fueled by high oil prices and major new discoveries made during 2011. The total investments ...
    • Reliability as a decision tool against SIL requirements 

      Eikeskog, Karl Henry (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Safety Instrumented Systems (SISs) is used in the oil and gas industry to detect the onset of hazardous events and/or to mitigate their consequences to humans, material assets, and the environment. International standards ...
    • Review of the risk management system in a contractor company 

      Sandven, Thor-Erik (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      This thesis has looked at how Apply Sørco handles risk, and what the legislations and international standards say about risk management. The purpose of this thesis is to evaluate the risk management system and procedures ...
    • Vurdering av faktorer som påvirker risikoen i forbindelse med fallende gjenstander offshore 

      Leiros, Kirsten Marie (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Bakgrunnen for oppgaven Vurdering av faktorer som påvirker risikoen i forbindelse med fallende gjenstander offshore er industriens ønske om å redusere antall personskader offshore. Selv om industrien har et høyt sikkerhetsnivå, ...
    • Den helhetlige kommunale risiko- og sårbarhetsanalysen i et teknisk-naturvitenskapelig perspektiv 

      Bolstad, Frank (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Alle landets kommuner plikter å utføre helhetlige kommunale risiko- og sårbarhetsanalyse for deres kommune. Ut av lovverk og veiledning til ROS fremkommer krav, forslag og anbefalninger til gjennomføring av ROS-analysen. ...
    • A risk register based on the (A,C,U) risk perspective 

      Jensen, Anders (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      A risk register is simply a collection of risk descriptions. However, most risk registers do not sufficiently capture the background knowledge which the contained risk descriptions are based on. To account for this, the ...
    • Value of risk management 

      Vik, Marie Amdal (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      The overall aim of this study was to discuss the validity of the hypothesis that risk management contributes with added value to projects and the enterprise holding the projects, and consequently to the enterprise’s ...
    • Development of a new framework for consideration and incorporation of human and organizational factors in the lifecycle of an engineering project 

      Løge, Filip Angell (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      There has been a large development on safety related issues and methods during the last 50 years since oil production started on the NCS. There has been a shift from prescriptive regulations towards today´s functional ...
    • Undersøkelse av metodikk for beregning av risikobaserte varmelaster 

      Holt, Ruben (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Denne oppgaven tar utgangspunkt i Scandpower sine retningslinjer for beskyttelse av trykksatt prosessutstyr som utsettes for brann. Metodene som vurderes i denne rapporten er hentet fra retningslinjene. Oppgaven vurderer ...
    • Risk reducing measures in the context of risk management in quantitative risk analysis for maintenance and modification projects 

      Arif, Talar (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Risk analysis in the oil industry is used to identify and address the risks that are involved in a certain situation, on for instance a platform. Risk analyses have a long history in the oil and gas industry, and have been ...