Oljeprisens påvirkning på norske boligpriser- effekten av oljeprisfallet høsten 2014
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-01-15)Denne masteroppgaven har som formål å finne ut om det er en sammenheng mellom boligprisen og oljeprisen. Dette gjøres ved å lage en variabel som justerer oljeprisen etter andel indirekte og direkte petroleumsansatte i ... -
On Operational Safety Compliance for More Reliable Risk Safety Functions In Offshore Installations
(Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-13)Due to a recent increase in major accident risk, efforts are being made to improve the robustness of the safety functions of offshore installations. Based on how the safety functions are defined and structured, their ... -
On the use of systems approach to improve decision-making process when performing economic evaluations for new health information technology
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06-12)Economic evaluations comprise comparative analyses of different alternatives in terms of their costs and consequences, and is used as a basis for making prioritizations and decisions. When deciding on whether to provide a ... -
Open shop scheduling in a manufacturing company using machine learning
(Master thesis, 2016-12-12)Scheduling jobs in a manufacturing company that delivers custom products is challenging. Aarbakke is a company that manufactures advanced assemblies for the oil and gas industry. Its existing resource planning tool frequently ... -
Opportunistic maintenance models: Review and discussion with a special focus on the treatment of uncertainty
(Masteroppgave/UIS-TN-IØRP/2011;, Master thesis, 2011)In this thesis, we review and discuss the area of opportunistic maintenance models. We want to examine if the existing models can be useful as decision-support to maintenance management, and focus especially on the treatment ... -
Optimal offshore supply vessel planning: a case study of a Chinese offshore oil and gas production area
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06)In the offshore oil and gas industry, the drilling or production installations scattered in the offshore oilfields require supplies from onshore depots. These supply services are performed specially by the offshore supply ... -
Optimalisering av anbudsprosessen i mellomstore teknologiselskap
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06-15)Oppgaven tar for seg gjennomføringen av anbudsprosesser i mellomstore teknologiselskap, med hovedfokus på tre områder; (1) den generelle organisering av anbudsarbeidet, (2) håndtering av økonomisk risiko og (3) aktiv bruk ... -
Optimalisering av V&M prosjektporteføljen for Aibel AS sitt kontor i Singapore
(Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012-06)I denne oppgaven er det sett på bruk av ingeniørkontor i Singapore som ressurs i en V&M kontrakt. Det er tatt utgangspunkt i Aibel sine V&M kontrakter som til sammen innebærer en stor mengde vedlikeholds- og modifikasjon ... -
Optimalisering og effektivisering av Halliburtons mud-mikseanlegg i Dusavik
(Masteroppgave/UIS-TN-IØRP/2016;, Master thesis, 2016-06-15)Denne masteroppgaven er et casestudie som tar for seg kostnader og tekniske faktorer, knyttet til optimalisering og effektivisering av Halliburtons mud-mikseanlegget i Dusavik. Hensikten med analysene er å se på mulige ... -
Optimize the HydraArchimedes cement insurance tool
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06)The HydraArchimedesTM tool is called a cement insurance tool because of its ability to squeeze cement out through casing perforations by rotating the tool inside a casing, thereby creating a rock-to-rock barrier. It is ... -
Optimized Field Development - Shale Gas
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015)In the recent decade there have been big changes in the oil and gas industry as the USA have increased their domestic oil and gas production due to shale oil and gas. The production from shale formations has been made ... -
Optimized Field Development - Shale Gas
(Master thesis, 2015)In the recent decade there have been big changes in the oil and gas industry as the USA have increased their domestic oil and gas production due to shale oil and gas. The production from shale formations has been made ... -
The Outside View: Correcting Biases in the Oil- and Gas Industry
(Masteroppgave/UIS-TN-ISØP/2020;, Master thesis, 2020-07-14)When companies want to operate and produce petroleum on the Norwegian continental shelf (NCS) they are generally required to make an extensive plan prior to the construction work. This is known as the plan for development ... -
Over Budget, Over Time, and Reduced Revenue, Over and Over Again - An Analysis of the Norwegian Petroleum Industry's Inability to Forecast Production
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06)It is a well-known fact that many projects on the Norwegian Continental Shelf (NCS) have been completed with cost overruns and schedule delays. Similar cost- and schedule deviations have been documented in other industries, ... -
Overvannshåndtering ved Aase Gård, Sandnes kommune : en casestudie
(Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)Aase Gård som ligger i Ganddal, Sandnes kommune, er i reguleringsplanen regulert til boliger. Ved arbeidet med detaljregulering av området blir det tidlig oppdaget kapasitetsproblemer med det eksisterende overvannsnettet. ... -
Ökad framgång av traditionell projektstyrning: med granskning utifrån framgångsfaktorerna inom produktionsfilosofin Just In Time.
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-06-12)Det finns flertalet faktorer som bidrar till att Traditionell Projektstyrning misslyckas. Projektstyrning tenderar till att både överskrida budget och tidsschemat eller avslutas i förväg. Vi har funnit ett antal faktorer ... -
Ökad framgång av traditionell projektstyrning: med granskning utifrån framgångsfaktorerna inom produktionsfilosofin Just In Time.
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-06-12)Det finns flertalet faktorer som bidrar till att Traditionell Projektstyrning misslyckas. Projektstyrning tenderar till att både överskrida budget och tidsschemat eller avslutas i förväg. Vi har funnit ett antal faktorer ... -
Passiv forvaltning av aktive fond
(Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-15)Vi har i denne oppgaven replikert 15 aktive norske fond i tidsperioden 2012-2017. Formålet med oppgaven har vært å undersøke om vi ved å replikere aktive norske fond kan oppnå en meravkastning i forhold til fondene. ... -
Passiv replikasjon av aktivt forvaltede aksjefond
(Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-15)I denne masteroppgaven undersøkes verdien av det å implementere en passiv investeringsstrategi på aktivt forvaltede porteføljer. Det ble plukket ut ti norske aksjefond. Porteføljene i halv- og helårsrapportene ble replikert ... -
Performance Improving Using Six Sigma
(Masteroppgave/UIS-TN-IØRP/2016;, Master thesis, 2016-06-15)Six Sigma and Lean are two of the most used improvement strategies in the world. In later years it has been argued that a combination of these will give an improved result compared to applying only one of the methods. The ...