Blar i Studentoppgaver (TN-ISØP) på emneord "electric plasma miller"
Viser treff 1-1 av 1
-
Expanding the Well Intervention Scope for an Effective P&A Operation
(Master thesis, 2017-06-14)Over 2500 wells on the Norwegian Continental Shelf (NCS) will at some point have to be permanently plugged and abandoned. As the drill rig rate contributes to 40-50% of the total plug and abandonment (P&A) cost, the potential ...