• Analysis of component criticality in the blowout preventer 

      Januarilham, Yahya (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      During well drilling operation, there is a possibility of a kick (influx). When a kick is not controlled properly it will become a blow out. This is an uncontrolled and sudden flow of formation fluid that releases from a ...
    • Analytical methods for risk assessment and reduction of the uncertainty 

      Toungsetwut, Monphen (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012-06-13)
      Risk is in involved in all activities especially in oil and gas industries. It is involved from the day one the project has started. Risk during the exploration phase, the chance that you found only dry wells the company ...