Blar i Studentoppgaver (TN-ISØP) på emneord "P&A"
Viser treff 1-3 av 3
-
Expanding the Well Intervention Scope for an Effective P&A Operation
(Master thesis, 2017-06-14)Over 2500 wells on the Norwegian Continental Shelf (NCS) will at some point have to be permanently plugged and abandoned. As the drill rig rate contributes to 40-50% of the total plug and abandonment (P&A) cost, the potential ... -
Failure prediction for subsea plug and abandonment using a method based on anticipatory failure determination
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-06-12)The oil and gas industry at the Norwegian Continental Shelf (NCS) is today facing hundreds of subsea wells that will need Plug and Abandonment (PnA) operations in the nearest future. Due to a marked where costs have escalated ... -
Feasibility of a Wireline Punching Tool
(Masteroppgave/UIS-TN-ISØP/2019;, Master thesis, 2019-06-13)This thesis describes the process of the development work completed for E Plug AS. A feasibility study on a downhole punching tool has been conducted. Furthermore, a simulation model has been created and evaluated through ...