• Efficiency of ICV/ICD systems 

      Gimre, Jeanette (Masteroppgave/UIS-TN-IØRP/2012;, Master thesis, 2012)
      Well completions today are very different from the traditional well completions. Reservoir complexity has increased, making horizontal wells the optimal solution in many reservoir cases, and an increase in the use of ...
    • Fast borestreng 

      Deeb, Yousef (Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)
      Fast borestreng er når en ikke kan rotere den, eller bevege strengen opp og ned. Flere mekanismer kan forårsake dette, blant annet formasjonsrelaterte problemer som for eksempel: ukonsoliderte formasjoner, mobile formasjoner, ...
    • Shoetrack drillout 

      Enge, Anders (Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-13)
      The petroleum industry constantly works to optimize operational aspects within drilling. The cost to drill a well is a parameter all companies want to minimize. To do this new technology and new methods are used to optimize ...