A Method for Probabilistic Time Estimation of Plug and Abandonment of the Wells on the Brage Field
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06-14)The production on several fields on the Norwegian continental shelf (NCS) is moving towards the critical point where expenses exceed the production income. Operating past the economical limit is not viable and thus, the ... -
Development of a Decommissioning Cost Estimation Model for Oil and Gas Fields on the Norwegian Continental Shelf
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06)Decommissioning of offshore installations on the Norwegian Continental Shelf (NCS) is not a new industry, but apart from the vast Frigg and Ekofisk I projects, it has seen little activity in the years since the production ... -
Optimize the HydraArchimedes cement insurance tool
(Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06)The HydraArchimedesTM tool is called a cement insurance tool because of its ability to squeeze cement out through casing perforations by rotating the tool inside a casing, thereby creating a rock-to-rock barrier. It is ...