• Critical reliability review of the BOP system 

      Blaauw, Maya (Masteroppgave/UIS-SV-ISØP/2020;, Master thesis, 2019-06)
      Blow Out Preventer, often referred to as BOP, is an important tool in drilling operation in the Oil and Gas industry. It is also one of the most important tools to secure the safety of drilling operations. Once a BOP system ...
    • Empowering Human Performance: A Case Study of Team Resource Management in CHC 

      Elverum, Marte (Masteroppgave/UIS-SV-ISØP/2020;, Master thesis, 2020-06-12)
      Crew Resource Management (CRM) is a well-known training concept developed in the aviation industry in the 1970’s to reduce human error after several horrific accidents. It has since expanded to other high-risk industries. ...
    • Estimation of Expected Lifetime of Highly Reliable Systems using Bayesian Analysis 

      Kurman, Anatoly (Masteroppgave/UIS-TN-ISØP/2019;, Master thesis, 2019-06)
      Nowadays, increasingly complex systems are critical due to the sectors and enterprises which they support. These are designed to be highly reliable and they are not expected to fail frequently. If a failure occurs, the ...
    • Optimisation of Test Intervals for Well Barriers 

      Kvæven, Anna (Masteroppgave/UIS-TN-ISØP/2019;, Master thesis, 2019-06-13)
      The common approach among operators on the Norwegian Continental Shelf to verify the functional integrity of well barriers, including the safety instrumented systems in wells, is to schedule proof tests according to the ...
    • What are the effects of changing the test interval of land based safety critical valves in hydrocarbon transport systems 

      Nawaz, Ch Muhammad Zahid (Masteroppgave/UIS-TN-IØRP/2008, Master thesis, 2008)
      In this master thesis, the effects of changing the test interval of the land based safety critical valves have been highlighted. Compliance with the regulations given by the PSAN (Petroleum Safety Authority Norway) ...