Blar i Studentoppgaver (TN-ISØP) på emneord "well intervention"
Viser treff 1-2 av 2
-
Expanding the Well Intervention Scope for an Effective P&A Operation
(Master thesis, 2017-06-14)Over 2500 wells on the Norwegian Continental Shelf (NCS) will at some point have to be permanently plugged and abandoned. As the drill rig rate contributes to 40-50% of the total plug and abandonment (P&A) cost, the potential ... -
The scale problem, scale control and evaluation of wireline milling for scale removal
(Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)Scale build up is one of the leading reasons for production decline in oilfields worldwide. Scale can be formed whenever water is produced; either by direct precipitation from the water that occurs naturally in the reservoir ...