dc.description.abstractThis paper is based upon the project of renewing of Waste Water Treatment plant in Bykle Commune in Aust Agder, Norway. It has been decided that it is necessary to build a new plant to meet the load as well as requirements for treatment. The new plant is to be located in Hovden at the newly developed industrial area in the southern part of the lake Hartevann. The commune has decided to build a common plant for “Midregion” of the commune as well as Hovden. The sewage from Hovden will have to be pumped to the Industrial are by means of a submerged pipe. The fluid from the “Midregion” requires new sewage lines for transferring of the fluid over a distance of 18 km. with an elevation of 150m. utilizing pumping stations incorporating buffer and storage tanks. The “Midregion” consists mainly of Vacation Homes where in vacation season the occupation is approximately 70%. There are less than 50 permanent residences in the “Midregion”. The “Midregion” does not today have common water supply but consists of private wells as well as small pumping stations of water. In the NIVA Report from 2003[Ref.:App.E] it is mentioned that in some area is not allowed for cabins to have an external water supply from private well or other source. The Commune intends to link all residential homes and cabins with a water supply from Hovden waterworks. The excavated ditch for the waterline will also contain the Sewage/fluid piping. The ditch has to be excavated at a minimum of 18 km in variable geological conditions ranging from gravel, more to solid rock. Hovden and the “Midregion” are facing the same challenge of an extensive variation of load as is common for all Vacation communities. The difficulty is evident when a small local population is to maintain a properly functioning sewage plant that can within the framework of national requirements meet the variation with proper cleaning. This paper is setting out to clarify the variable load problem by looking at available technology as well as assessing the communities’ decision of technology to be used. The paper further focuses on the environmental as well as the economic impact and consequences of the communes’ final decision. This paper further gives a conclusive advice to Bykle Commune in the aspects of plant and the economic impact. For the matter of accuracy some reports used for this paper is presented in original in Norwegian. The assessment papers are attaches as well as discussion with the communes’ consultant from Sweco Norge AS. The conclusion of this investigation and verification is that the “Midregion” should not be connected to a common plant at the Industrial Area in Hovden. It is both Environmentally and Economic advisable to build several Biodisk Sewage Plants using diffusion beds as receptacles for the effluent and letting the Biotope Biologically perform the end task of cleaning without any outlet into rivers or lakes. At the Hovden area it points itself out as the only solution both environmentally and economically to use the BioBooster from Grundfos of Denmark. The BioBooster can handle the variable load as well as the future expansion without large construction and unnecessary economic cost of concrete tank and building. The BioBooster using a ultra filtration membrane gives a total cleaning result and a extremely clean effluent. (See final paper “Hovden Renseanlegg. Kort Assessment. Report til Bykle Kommune.” and Disscussion [Ref.: App.I])en
dc.format.extent8668339 bytes
dc.format.mimetypeapplication/pdf
dc.language.isoengen
dc.publisherUniversity of Stavanger, Norwayen
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IMN/2009en
dc.subjectoffshore teknologien
dc.subjectteknisk miljøvernen
dc.subjectsewage planten
dc.subjectvariable loadolden
dc.subjectold and new technologyen
dc.subjectcentralizationen
dc.subjectproblem solvingen
dc.titleVariable load related problems in projecting wastewater treatment plant in Bykle Commune at Hovdenen
dc.typeMaster thesisen
dc.subject.nsiVDP::Technology: 500::Environmental engineering: 610en


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Master's theses (TN-IMN, 2007-2017) [233]
    Masteroppgaver i Science of environmental technology (offshore environmental engineering og water science and technology) / Masteroppgaver i Realfag med teknologi: matematikk / Masteroppgaver i Biologisk kjemi

Vis enkel innførsel