• Marine Operations in Arctic conditions 

      Gudmestad, Ove Tobias; Døskeland, Øystein Husevåg (Peer reviewed; Journal article, 2023)
      Marine operations require careful early planning and thereafter detailed planning prior to project execution. The time from initiating an operation to finalization of the activity is typically several days. The activity ...
    • A Relationship Between Breaking Wave Characteristics and Slamming Forces Acting on Jacket Structures 

      Podrazka, Olga; Cieslikiewicz, Witold; Gudmestad, Ove Tobias (Peer reviewed; Journal article, 2019)
      The goal of this study was to investigate and describe the relationship between breaking wave characteristics and total slamming forces acting on a jacket structure in shallow water, based on the experimental data collected ...