• Geopolymering av norite 

      Kolberg, Lars-Espen (Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-07-29)
      This thesis on ‘’Geopolymerization of Norite’’ has been a study of plugging materials for plug and abandonment operations, and the different requirements for plug and abandonment operations based on Norsok D-010 standard. ...
    • Method selection study of future plug and abandonment at Gjøa field 

      Aunan, Krister (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      On the Norwegian Continental Shelf (NCS) there will be a wave of subsea and platform wells that will eventually need to be plugged and abandoned (P&A’d) in a safe and efficient manner. The well abandonment phase is the ...
    • P&A - status on regulations and technology, and identification of potential improvements 

      Eshraghi, Daniel (Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-06-12)
      There will be a wave of wells needing to be abandoned in the North Sea over the next decades. The abandonment operation is known as Plug and Abandonment, or just P&A. As P&A has no value creation, it is very important that ...