Blar i Department of Petroleum Engineering på emneord "closed-loop drilling"
Viser treff 1-1 av 1
-
Managed pressure drilling from floaters
(Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-06-05)Drilling in challenging environments with different drilling hazards cause a lot of non-productive time (NPT), ie time where the rig is not drilling. Much of the challenging environments are in water depth demanding the ...