Blar i Department of Petroleum Engineering på emneord "best fit well test data"
Viser treff 1-1 av 1
-
Optimization of gas lift system in Varg field
(Masteroppgave/UIS-TN-IPT/2007, Master thesis, 2007)The objective of this thesis work is to obtain the optimum gas injection rate which yields the maximum oil production. Obtaining the optimum gas injection rate is important because excessive gas injection rate reduces oil ...