Blar i Department of Petroleum Engineering på emneord "coiled tubing"
Viser treff 1-1 av 1
-
A rigless permanent plug and abandon approach
(Masteroppgave/UIS-TN-IPT/2012;, Master thesis, 2012)There are many options to perform a PP&A operation. The goal of this thesis was to look at the opportunities to perform an effective offline PP&A of wells based on cost, time and personnel. After searching through Service ...