Blar i Department of Petroleum Engineering på emneord "open water coiled tubing"
Viser treff 1-1 av 1
-
Subsea live well intervention using a riserless/open water coiled tubing system - System overview and operational weather limitations
(Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06-15)This thesis gives an introduction both to a conventional CT operation setup and to an open water coiled tubing (OWCT) system and focuses on the main differences. An overview of proposed OWCT concepts is briefly presented. To ...