Blar i Department of Petroleum Engineering på emneord "re-entry"
Viser treff 1-1 av 1
-
Feasibility study to perform coiled tubing drilling on Gullfaks-A
(Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-06-13)This report is carried out as part of Decision gate1 (DG1) feasibility study conducted for the possibility of commencing coiled tubing drilling to drill slim holes simultaneously with other drilling activities on Gullfaks ...