• Formation as Barrier for Plug and Abandonment of Wells 

      Fredagsvik, Katrine (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06-15)
      To permanently plug and abandon (P&A) of drilled wells, permanent barrier(s) should be established. Cement is the primer material used for zonal isolation and permanent P&A as barrier material. However, it is recognized ...
    • Investigation of mechanical property of aplite-based geopolymer for plug and abandonment 

      Obara, Integrity (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      Historically and up to date, ordinary Portland cement (OPC) or a slight variation is the most widely used material for permanent Plug & Abandonment operation. However, there are several challenges related to cement usage. ...
    • Theoretical Study on Utilization of X-ray Techniques for Verification of Casing Cement 

      Haddad, Muhammad Yasser (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06)
      Establishing a hydraulic seal that prevents flow is the primary objective of any cement job, as it is essential throughout the life of a well. Evaluation of the cement in the annulus must be done to verify its quality. ...