• Investigation of Leakage Paths in Well Abandonment 

      Steine Johnsen, Alexander (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      A large number of wells will have to be abandoned at the NCS and around the world. NORSOK D-010 states that a well that is permanently abandoned shall be abandoned with an eternal perspective and with zero leakage [1]. ...
    • Time Estimation of Future Plug and Abandonment Operation at Brage Field 

      Fjelde, Olav (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06-15)
      Production of oil on the Norwegian continental shelf started in the early 70’s. Many of these fields are now reaching the end of their production time. The industry is now awaiting a “plug wave” in the not too distant ...