• Drilling operation efficiency 

      Lenning, Eivind (Masteroppgave/UIS-TN-IPT/2014;, Master thesis, 2014-06-16)
      The petroleum industry on the Norwegian Continental Shelf is in a time with well construction time and cost as an increased challenging factor. The operators desire to discontinue this trend and are currently cutting cost. ...
    • Optimization of jars 

      Altamirov, Dishni (Masteroppgave/UIS-TN-IPT/2014;, Master thesis, 2014-07-01)
      Stuck pipe is a major problem for the oil industry, and getting bigger as more complex horizontal and deviated wells are drilled. What causes this problem and the ways to avoid it are presented. The main tool to unstuck ...