• A New P&A technology for setting the permanent barriers 

      Mortensen, Frank Michael (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06-15)
      This thesis presents an innovative way of plugging wells in the near future. The technology is based on various exothermic reactions lowered into the well at desired plugging depths. The ensuing reactions melt and engulf ...
    • Formation as Barrier for Plug and Abandonment of Wells 

      Fredagsvik, Katrine (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06-15)
      To permanently plug and abandon (P&A) of drilled wells, permanent barrier(s) should be established. Cement is the primer material used for zonal isolation and permanent P&A as barrier material. However, it is recognized ...
    • Investigation of Leakage Paths in Well Abandonment 

      Steine Johnsen, Alexander (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      A large number of wells will have to be abandoned at the NCS and around the world. NORSOK D-010 states that a well that is permanently abandoned shall be abandoned with an eternal perspective and with zero leakage [1]. ...
    • Method selection study of future plug and abandonment at Gjøa field 

      Aunan, Krister (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      On the Norwegian Continental Shelf (NCS) there will be a wave of subsea and platform wells that will eventually need to be plugged and abandoned (P&A’d) in a safe and efficient manner. The well abandonment phase is the ...
    • P&A in Arctic conditons 

      Mehari, Elsa Taeme (Master thesis, 2014-06-30)
      All oil and gas wells will require plugging and abandonment (p&a) at some point in their operating life. Considering the challenging nature of the Arctic weather, its remoteness and lack of infrastructures, and its ice ...
    • P&A using PWC technique and verification of the plug 

      Erland, Sofie Stange (Master thesis, 2014-06-16)
      When a well is permanently plugged and abandoned (P&A), a plug has to be set over the entire cross section of the well. The conventional method to perform a P&A operation is to mill the casing and pull it to surface before ...
    • Plug and abandonment operations and tool positioning 

      Saad, Idrees (Masteroppgave/UIS-TN-IPT/2014;, Master thesis, 2014-06-13)
      With aging oil fields, the Norwegian petroleum authorities are focusing on Plug and Abandonment (P&A) plans. Therefore efforts are being made, by relevant authorities, to improve standards and procedures for the P&A ...
    • Plug and Abandonment Technology Evaluation and Field Case Study 

      Halvorsen, Christer (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      In the North Sea, the average field age is increasing and a large number of wells needs to be plugged and abandoned in the future. P&A is regarded as an operation with no financial returns and is associated with significantly ...
    • Plug and abandonment, milling operations and simulations 

      Randby, Marie (Masteroppgave/UIS-TN-IPT/2014;, Master thesis, 2014-06-13)
      During plug and abandonment, there can be a need for removing casing to ensure that a proper cement barrier can be set. The conventional method for doing this is by performing milling oper ...
    • Theoretical Study on Utilization of X-ray Techniques for Verification of Casing Cement 

      Haddad, Muhammad Yasser (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06)
      Establishing a hydraulic seal that prevents flow is the primary objective of any cement job, as it is essential throughout the life of a well. Evaluation of the cement in the annulus must be done to verify its quality. ...