• Integrity Monitoring Methods for Producing and Plugged Wells 

      Berge, Unni Marina (Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-07)
      More challenging wells in sensitive areas require appropriate integrity monitoring to address the safety and environmental concerns. The purpose of this thesis was to gain an overview of the current status of well integrity ...
    • Method selection study of future plug and abandonment at Gjøa field 

      Aunan, Krister (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      On the Norwegian Continental Shelf (NCS) there will be a wave of subsea and platform wells that will eventually need to be plugged and abandoned (P&A’d) in a safe and efficient manner. The well abandonment phase is the ...
    • P&A - status on regulations and technology, and identification of potential improvements 

      Eshraghi, Daniel (Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-06-12)
      There will be a wave of wells needing to be abandoned in the North Sea over the next decades. The abandonment operation is known as Plug and Abandonment, or just P&A. As P&A has no value creation, it is very important that ...
    • P&A operations today and improvement potential 

      Steen, Christian (Masteroppgave/UIS-TN-IPT/2013;, Master thesis, 2013-05-29)
      Today rig/derrick and vessels is traditionally used to perform a P&A operation. With a rising need for P&A operations combined with the wish of having a stable level of drilling operations, a shortage of rigs will be a ...
    • Plug and Abandonment Technology Evaluation and Field Case Study 

      Halvorsen, Christer (Masteroppgave/UIS-TN-IPT/2016;, Master thesis, 2016-06)
      In the North Sea, the average field age is increasing and a large number of wells needs to be plugged and abandoned in the future. P&A is regarded as an operation with no financial returns and is associated with significantly ...