Blar i Master's theses (TN-IPT 2007-2017) på emneord "tieback string"
Viser treff 1-1 av 1
-
Selection of Long or Short Production Casing on HPHT Wells
(Masteroppgave/UIS-TN-IPT/2017;, Master thesis, 2017-06)Drilling in high-pressure high-temperature (HPHT) wells present many economical, technical and operational challenges. The wells are usually located in deep water¬¬¬––where the total well cost and trip times are increased. ...