Vis enkel innførsel

dc.contributor.authorSaeed, Ayesha
dc.date.accessioned2016-09-16T10:47:58Z
dc.date.available2016-09-16T10:47:58Z
dc.date.issued2016-06-15
dc.identifier.urihttp://hdl.handle.net/11250/2407782
dc.descriptionMaster's thesis in Risk managementnb_NO
dc.description.abstractMost of the offshore oil and gas installations are going towards the cessation of their production life, which means that the decommissioning activity will be increasing in years to come. Decommissioning of the offshore installation is a complex and challenging task. A proper risk management process is needed to identify safety challenges and issues associated with decommissioning activities. In this thesis, some significant safety challenges and issues have been identified. The thesis proposes a risk management process that determines the cause and consequences of each hazard by using Bayesian network. Uncertainty assessment procedures have also been included for the risk analysis results to provide useful information to decision makers. In addition, mitigation techniques for identified hazards have been suggested. In the end, a case study has been carried out to implement and show that proposed risk management process provides a better way to foresee decommissioning safety issues and control them effectively. In this thesis, Shell Leman BH field is used as a case study. The comparison is made between Shell risk control framework and suggested risk management process for particular points like risk definition, risk acceptance criteria, and risk assessment matrix. For these particular points, it is found that the general Shell risk management framework provides a vulnerable mitigation plan as it doesn’t include uncertainty associated with the probability values according to new risk perspective proposed by Aven (2013) and by risk definition of PSA (2016). The proposed risk management process in this thesis applied to identify the hazards for decommissioning of Leman BH field. The analysis procedure results given by proposed process is providing better management and mitigation procedure for the safety issues. The proposed risk management process provides a better decision making as it uses Bayesian network together with uncertainty analysis.  nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IØRP/2016;
dc.subjectrisikostyringnb_NO
dc.subjectrisk managementnb_NO
dc.subjectoffshore technologynb_NO
dc.titleIdentify and handle safety challenges during decommissioning of offshore installationsnb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-ISØP) [1410]
    Master- og bacheloroppgaver i Byutvikling og urban design / Offshore technology : risk management / Risikostyring / Teknologi/Sivilingeniør : industriell økonomi / Teknologi/Sivilingeniør : risikostyring / Teknologi/Sivilingeniør : samfunnssikkerhet

Vis enkel innførsel