dc.contributor.advisorKhalifeh, Mahmoud
dc.contributor.advisorMaouche, Maxime
dc.contributor.authorWittberg, Stian André
dc.date.accessioned2017-09-22T13:14:15Z
dc.date.available2017-09-22T13:14:15Z
dc.date.issued2017-06-14
dc.identifier.urihttp://hdl.handle.net/11250/2456334
dc.descriptionMaster's thesis in Industrial economicsnb_NO
dc.description.abstractOver 2500 wells on the Norwegian Continental Shelf (NCS) will at some point have to be permanently plugged and abandoned. As the drill rig rate contributes to 40-50% of the total plug and abandonment (P&A) cost, the potential savings in shifting operations towards a rigless approach could be significant. The main objective during a P&A operation is to restore cap rock functionality, by creating a cross-sectional barrier. The conventional way of plugging wells on NCS is to use a rig, to allow pulling tubing, section milling or perforate, wash and cement operations to be executed. This thesis presents an alternative approach to P&A using well intervention equipment in combination with some emerging high-energy technologies intended for rigless P&A. Wireline and coiled tubing with associated equipment and tools are used together with an electric plasma miller and/or thermite to create a cross-sectional barrier in a through tubing and X-mas tree P&A operation. A case study is presented where three wells are plugged using a rigless approach. The wells have an increasing P&A complexity, where lack of annular barrier traditionally requires a rig. The case study identified several challenges with the presented rigless approach. A through tubing operation will leave the tubing as a major restriction in the well. All tools have to pass through the tubing before reaching the required plugging interval. Azimuthal bond logging tools intended for logging production casing cement will have particular difficulty passing tubing of 5-1/2” and smaller. Additionally, placing enough thermite to comply with current NORSOK D-010 specifications was found challenging. New revisions of NORSOK D-010 should allow the implementation of new technology and rigless P&A to open up for a leaner approach to P&A. The majority of the wells studied were not fully suited for a complete rigless P&A operation, but the approach could be used to install permanent reservoir barriers. By completing parts of the plugging operation using well intervention equipment, the P&A scope for a rig could be minimized and thereby potentially saving cost.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.subjectplug and abondonmentnb_NO
dc.subjectindustriell økonominb_NO
dc.subjectP&Anb_NO
dc.subjectriglessnb_NO
dc.subjectthrough tubingnb_NO
dc.subjectwell interventionnb_NO
dc.subjectcase studynb_NO
dc.subjectelectric plasma millernb_NO
dc.subjectthermite plugnb_NO
dc.subjectkontraktsadministrasjonnb_NO
dc.titleExpanding the Well Intervention Scope for an Effective P&A Operationnb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Samfunnsvitenskap: 200::Økonomi: 210nb_NO
dc.subject.nsiVDP::Teknologi: 500::Berg‑ og petroleumsfag: 510nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-ISØP) [1411]
    Master- og bacheloroppgaver i Byutvikling og urban design / Offshore technology : risk management / Risikostyring / Teknologi/Sivilingeniør : industriell økonomi / Teknologi/Sivilingeniør : risikostyring / Teknologi/Sivilingeniør : samfunnssikkerhet

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal