• Modelling and Simulation of Annular Pressure Build up 

      Elsheikh, Muhammed Mahmoud Abdelrhman (Masteroppgave/UIS-TN-IEP/2018;, Master thesis, 2018-06)
      Annular pressure buildup (APB) has been a concern for well design in the recent years. It is a phenomenon that relates mainly to subsea wells with possibly no means to release the pressure building up in closed annuli. ...
    • A Numerical Study of Pressure Build Up due to Kick Migration in a Closed Well Filled with Water-Based Mud 

      Tat, Thea Hang Ngoc (Masteroppgave/UIS-TN-IEP/2020;, Master thesis, 2020-06-15)
      There has been considerable and diverging discussion in the academic literature regarding the real gas kick velocity. This thesis contributes to improving and sharing the knowledge about the real gas kick velocity. It is ...