Vis enkel innførsel

dc.contributor.advisorSui, Dan
dc.contributor.authorMeling, Kristoffer
dc.date.accessioned2018-10-23T07:38:44Z
dc.date.available2018-10-23T07:38:44Z
dc.date.issued2018-06-14
dc.identifier.urihttp://hdl.handle.net/11250/2569053
dc.descriptionMaster's thesis in Petroleum engineeringnb_NO
dc.description.abstractOver time the remaining oil prospects are becoming harder to drill and managed pressure drilling is a tool that can be used to reach target depth in depleted reservoirs or similar narrow margin scenarios. In any narrow margin drilling scenario, a critical part of the operation is going to be the tripping in/out along with the ramping of pumps. This thesis investigates the influences of pump ramping schemes during connections of new standpipe on bottom hole pressures by using a simulator called openlabdrilling developed by IRIS. The case study is conducted by using a matlab interface connected to the openlabdrilling simulator through their API and using a slight modification of the FlowSweep_BHPcontrol code allowed for automatic control of the choke opening with the PI controller that was included in the code bundle from openlabdrilling.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IEP/2018;
dc.subjectpetroleumsteknologinb_NO
dc.subjectpetroleum technologynb_NO
dc.subjectmanaged pressure drillingnb_NO
dc.subjectboreteknologinb_NO
dc.titlePump pressure manipulation during MPD connectionnb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Teknologi: 500::Berg‑ og petroleumsfag: 510::Petroleumsteknologi: 512nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel