dc.contributor.advisor | Sui, Dan | |
dc.contributor.author | Meling, Kristoffer | |
dc.date.accessioned | 2018-10-23T07:38:44Z | |
dc.date.available | 2018-10-23T07:38:44Z | |
dc.date.issued | 2018-06-14 | |
dc.identifier.uri | http://hdl.handle.net/11250/2569053 | |
dc.description | Master's thesis in Petroleum engineering | nb_NO |
dc.description.abstract | Over time the remaining oil prospects are becoming harder to drill and managed pressure drilling is a tool that can be used to reach target depth in depleted reservoirs or similar narrow margin scenarios. In any narrow margin drilling scenario, a critical part of the operation is going to be the tripping in/out along with the ramping of pumps. This thesis investigates the influences of pump ramping schemes during connections of new standpipe on bottom hole pressures by using a simulator called openlabdrilling developed by IRIS.
The case study is conducted by using a matlab interface connected to the openlabdrilling simulator through their API and using a slight modification of the FlowSweep_BHPcontrol code allowed for automatic control of the choke opening with the PI controller that was included in the code bundle from openlabdrilling. | nb_NO |
dc.language.iso | eng | nb_NO |
dc.publisher | University of Stavanger, Norway | nb_NO |
dc.relation.ispartofseries | Masteroppgave/UIS-TN-IEP/2018; | |
dc.subject | petroleumsteknologi | nb_NO |
dc.subject | petroleum technology | nb_NO |
dc.subject | managed pressure drilling | nb_NO |
dc.subject | boreteknologi | nb_NO |
dc.title | Pump pressure manipulation during MPD connection | nb_NO |
dc.type | Master thesis | nb_NO |
dc.subject.nsi | VDP::Teknologi: 500::Berg‑ og petroleumsfag: 510::Petroleumsteknologi: 512 | nb_NO |