Vis enkel innførsel

dc.contributor.authorJacobsen, Sigurd Robert
dc.contributor.authorViddal, Steven
dc.contributor.authorDørum, Kjell-Gunnar
dc.contributor.authorGudmestad, Ove Tobias
dc.contributor.authorWiencke, Hermann Steen
dc.date.accessioned2023-01-25T14:30:58Z
dc.date.available2023-01-25T14:30:58Z
dc.date.created2019-12-05T13:13:07Z
dc.date.issued2019
dc.identifier.citationJacobsen, S. R., Viddal, S., Dørum, K. G., Gudmestad, O. T., & Wiencke, H. S. (2019, November). Development of a method for evaluation of measures used for winterization of offshore facilities and units. In IOP Conference Series: Materials Science and Engineering (Vol. 700, No. 1, p. 012043). IOP Publishing.en_US
dc.identifier.issn1757-8981
dc.identifier.urihttps://hdl.handle.net/11250/3046383
dc.description.abstractThe environmental conditions in the Barents Sea include low temperatures, wind, snow and precipitation influencing safety, working environment, operations and equipment functionality. The conditions are not extreme compared to other Arctic areas, however they do necessitate protection and winterization of the facility. A study performed for the Petroleum Safety Authority (PSA) in 2016 identified known measures for winterization of facilities in the Barents Sea. The study found uncertainties related to the effect the measures have on winterization when considering environmental conditions. Further work was recommended to evaluate the effect of measures when considering performance influencing factors. A new study was initiated by PSA to develop a method to evaluate the efficiency of measures and a means to document the results. The method considers how well a measure achieves a specific safety and winterization goal, effect of the measure on energy consumption, effect of the measure on investment cost and operating cost, and vulnerability of the measure, including operational and organizational factors. In order to refine and test the method, it was applied to case studies considering a year-round production facility, a light well intervention vessel and a drilling facility used in the winter season in the Barents Sea. The paper is not intended to be a research paper but is a presentation of a method that has been developed to perform an initial evaluation of the effectiveness of winterization methods.en_US
dc.language.isoengen_US
dc.publisherIOP Publishingen_US
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.titleDevelopment of a method for evaluation of measures used for winterization of offshore facilities and unitsen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.rights.holderThe authorsen_US
dc.subject.nsiVDP::Teknologi: 500en_US
dc.source.pagenumber11en_US
dc.source.volume700en_US
dc.source.journalIOP Conference Series: Materials Science and Engineeringen_US
dc.source.issue1en_US
dc.identifier.doi10.1088/1757-899X/700/1/012043
dc.identifier.cristin1757151
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal