Blar i Universitetet i Stavanger på emneord "quantitative risk assessment"
Viser treff 1-5 av 5
-
Communication of uncertainties and robustness in quantitative risk assessment
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-06-15)The use of quantitative risk assessment, in all phases of an offshore oil and gas project in Norway, has clear requirements in NORSOK Z-013. The purpose of QRA is to describe the risk picture and give decision support ... -
Design for operation and maintenance of the Johan Sverdrup oil and gas field
(Student paper, others, 2014-04)The Johan Sverdrup field was discovered in 2010, formed by three blocks (PL 501, PL 265 and PL 502) on the North Sea, with an estimated of reserves between 1.8 billion to 2.8 billion Barrels of Oil, so assessing the ... -
Quantitative risk assessment of vehicle accidents to provide risk insight for commuting activities in Jakarta, Indonesia
(Masteroppgave/UIS-TN-ISØP/2019;, Master thesis, 2019)In the city of Jakarta, the students, working class or any people needing to commute within the city have the option to take the private-owned vehicle or the public mass transport. The private-owned vehicle consists of ... -
Review of Current Risk Assessment Framework in Gaseous Hydrogen Refuelling Stations with Suggestions of Improvement based on New Perspectives in Risk
(Master thesis, 2017-06-15)During the energy evolution currently undertaken, hydrogen has emerged as a potential energy carrier among others in transportation sector. However, assuring safety of the relevant infrastructure is a prerequisite to the ... -
Risk Conceptualization and Description in Inherent Risk Assessment As A New Concept Of Risk Assessment and Comparison to QRA Practice In Norway
(Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06)In 2009, Shariff and Leong [1] introduced a new concept named as Inherent Risk Assessment (IRA). The concept integrates quantitative risk analysis and to a process design simulator called HYSYS aiming to provides essential ...