Blar i Studentoppgaver (TN-ISØP) på forfatter "Osmundsen, Petter"
-
A comparison of Aker BP`s alliance model and the conventional competitive model on the Norwegian continental shelf
Svendsen, Linn; Kristoffersen, Elise (Master thesis, 2021)The oil and gas industry has faced many obstacles in recent years, which has led to companies in the industry being forced to find new ways of working and collaborating. In connection to this, the alliance model has been ... -
A comparison of Aker BP`s alliance model and the conventional competitive model on the Norwegian continental shelf.
Kristoffersen, Elise; Svendsen, Linn (Master thesis, 2021)The oil and gas industry has faced many obstacles in recent years, which has led to companies in the industry being forced to find new ways of working and collaborating. In connection to this, the alliance model has been ... -
Analysis of commercial time based incentive model targeting efficiency in drilling rig contracts
Bakkevik, Nikolai (Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-15)The most common form of rig contracts are day rate contracts, in which the oil company rents the rig for a stated rate for each day of the contract term. However, with the shift in negotiation power from rig companies to ... -
Analysis of method for increased field knowledge prior to the field development
Fevang, Finn Øivind (Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-04)Field development is an expensive phase with a high uncertainty due to the limited reservoir knowledge prior to field production. Consequently, the field facilities must be flexible to changes, such as: new wellbores, new ... -
Analyzing the Impact of EU Framework on the Trudvang CCS Project & the Value Chain’s IRR
Skogstad, Haakon; Vikse, Eline Jacobsen (Master thesis, 2023)This thesis sets out to shed light on aspects surrounding Carbon Capture & Storage (CCS). It is written in collaboration with Sval Energi AS, taking into account the Trudvang project. The goal is to investigate the potential ... -
Digitalizing Operations Management: Real-Time Opex System Design for the Ivar Aasen Asset
Solem, Kristian (Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-12-14)After a drop in the oil price in 2014 -- 2016, the oil and gas industry renewed their focus on cost reduction. The use of real--time data has become commonplace, but one area lagging behind is financial data. Financial ... -
Electrification of Kårstø? Stakeholders analysis of gas processing plant
Hardy, Kevin (Masteroppgave/UIS-TN-ISØP/2020;, Master thesis, 2020-09-01)The main objective of this thesis is to perform a stakeholder analysis of the key stakeholders in the Kårstø Partial Electrification (KPE) project. This will be done primarily through interviewing different types of ... -
ELEKTRIFISERING AV VANNINJEKSJONSPUMPER VED ET OFFSHORE OLJEFELT, ØKONOMISK OG CO2 UTSLIPPS ANALYSE OVER ET 30-ÅRS PERSPEKTIV
Holm, Erlend (Master thesis, 2021)Oil field operators on the Norwegian Continental Shelf face increasing cost on CO2 emissions in the coming years. A clear incentive for finding solutions which reduce operational emissions from the field. Water injection ... -
Historical development and outlook of offshore wind. Dudgeon Offshore Wind Farm case study.
Hansen, Mats Hagland; Handegård, Ole Christian (Master thesis, 2022)The Dudgeon Offshore Wind farm is located off the coast of the seaside town of Cromer in North Norfolk in the UK. After the final financial investment decision was made in mid-2014, the wind farm started construction in ... -
Historical development and outlook of offshore wind. Dudgeon Offshore Wind Farm case study.
Hansen, Mats Hagland; Handegård, Ole Christian (Master thesis, 2022)The Dudgeon Offshore Wind farm is located off the coast of the seaside town of Cromer in North Norfolk in the UK. After the final financial investment decision was made in mid-2014, the wind farm started construction in ... -
Hywind Tampen, project NPV calculation with and without subsidies
Tveiten, Åsmund Sandvik; Tangerås, Bjørn-Tore (Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-12-13)Equinor is currently considering the development of an offshore wind farm on the Tampen area in the North Sea. The plan is to partly supply the five installations Gullfaks A, B, C and Snorre A and B with renewable energy. ... -
Kontrakthåndtering for totalunderentreprenører – Håndtering av grensesnitt og endringer ved konstruksjoner av prefabrikkerte betongelementer
Bergheim, Martin (Masteroppgave/UIS-TN-IØSP/2020;, Master thesis, 2020-07-15)Dagens byggeprosjekter er i utvikling. Prosjektene er sammensatt av mange fagfelt og aktører som krever et tett samarbeid for å kunne levere et prosjekt. Byggeprosessen består av ulike faser, fra idé til ferdigstilt prosjekt. ... -
Milepælsbetalinger som system for fremdriftsbetalinger i entreprisekontrakter
Århaug, Eirik (Master thesis, 2023)Entreprisekontrakter varer ofte over lengre perioder og entreprenøren har i løpet av prosjektet store utgifter. For at entreprenøren skal ha tilstrekkelig likviditet underveis i prosjektet får han normalt betalt i takt med ... -
Performance evaluation of the seismic and SURF market with emphasis on relation to oil price
Jacobsen, Tore (Masteroppgave/UIS-TN-ISØP/2020;, Master thesis, 2020-06)The commodity price of oil is strongly influenced by supply and demand. Oil service companies which in this thesis have been limited to contain key players from the seismic/geophysical and SURF (Subsea Umbilicals Risers ... -
Procurement strategy for offshore electrification projects
Rudolfsen, Frode (Masteroppgave/UIS-TN-IØRP/2016;, Master thesis, 2016-06-15)Electrification of offshore installations has been an evaluated option for several platforms on the Norwegian Continental shelf (NCS). Offshore installations consume huge quantities of energy and for the majority of the ... -
Profitability of Enhanced Oil Recovery. Economic Potential of LoSal EOR at the Clair Ridge Field, UK.
Layti, Frida (Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-15)Low salinity water injection is an emerging enhanced oil recovery (EOR) technology, just on the verge of being implemented at full scale at the Clair Ridge field, UK. Clair Ridge will be the world’s first offshore deployment ... -
Turnkey contracts in production drilling
Tomassen, Bjørnar (Masteroppgave/UIS-TN-IØRP/2017;, Master thesis, 2017-06-15)Over the past few years, the drilling industry on the Norwegian Continental Shelf (NCS) and worldwide has faced a significant change. With declining oil prices, the margins for both oil companies and service contractors ... -
Utbygging av marginalt lønnsomme ressurser nær eksisterende infrastruktur
Maeland, Marthe; Vassbotn, Kristine Bakke (Masteroppgave/UIS-TN-IØRP/2018;, Master thesis, 2018-06)I de mest modne områdene på norsk sokkel er det et økende fokus på utvinning av mindre olje- og gassfunn i nærheten av eksisterende infrastruktur. Myndighetene ønsker at mest mulig av petroleumsressursene skal produseres, ... -
Well decommissioning using BHGE's subsea wellhead terminator
Aasen, Andre; Stavland, Sander (Masteroppgave/UIS-TN-ISØP/2019;, Master thesis, 2019-06)The world’s portfolio of oil and gas wells are ageing. Plug and abandonment is the final and inevitable stage of every well. As a result, decommissioning is set to grow steadily in the coming years, as more and more wells ...