Blar i Studentoppgaver (TN-ISØP) på emneord "VDP::Technology: 500::Rock and petroleum disciplines: 510"
Viser treff 1-11 av 11
-
Addressing zonal isolation challenges and improving 9 5/8" production liner primary cement jobs across the Valhall field
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-12)Placing cement in the annulus between a casing string and the borehole is essential to obtain compliant zonal isolation. Circumferentially bonded cement provide a hydraulic seal which prevents cross flow between permeable ... -
ALARP i Aker Offshore Partner
(Masteroppgave/UIS-TN-IØRP/2010;, Master thesis, 2010)I 2002 ble det i Rammeforskriften innført krav om ALARP-prosesser i petroleums-virksomheten i Norge. ALARP er en forkortelse for ”As Low As Reasonably Practicable”, og innebærer å redusere risikoen utover gjeldende krav i ... -
Choosing appropriate commercial models for overseas business: a case study of a Chinese oil service provider towards internationalization
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-16)Due to ever increasing domestic demands on oil and gas, more and more Chinese oil and gas companies have been encouraged to expand towards overseas markets, which potentially brings opportunities for the domestic OFS ... -
Concept study of modification alternatives for the High Pressure Cap Running Tool
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-13)This thesis is a result of a request from Aker Solutions regarding a modification project of a high pressure cap running tool. This tool is used to set and retrieve the high pressure cap from the flow line mandrel when the ... -
Dokumentasjon av krav i IEC 61511-1 og usikkerhet knyttet til SIL
(Masteroppgave/UIS-TN-IØRP/2013;, Master thesis, 2013)I olje- og gassektoren stilles det strenge krav til sikkerhetssystemer hvor det er særdeles viktig å ha et system man kan stole på når en farefull hendelse kan oppstå. Instrumenterte sikkerhetssystem (SIS) er uavhengige ... -
Et studie av NeoDrill sin innovative Conductor Anchor Node(CAN) teknologi, og den sitt potensial på norsk og britisk kontinentalsokkel:
(Masteroppgave/UIS-TN-IØRP/2015;, Master thesis, 2015-10-26)NeoDrill har utviklet et nytt brønnfundament for petroleumsbrønner offshore. Conductor Anchor Node(CAN) er et sugeanker som gir ekstremt gode lastkapasitet i forhold til konvensjonelle petroleumsbrønner. Utgangspunktet ... -
Evaluation of the reorganization at GE Oil & Gas, Dusavik site for the XT department
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-30)Cost increase has proven to become one of the main challenges for the oil and gas industry on the Norwegian Continental Shelf. Several Norwegian suppliers in the oil and gas industry have lost contracts because of this ... -
Optimal offshore supply vessel planning: a case study of a Chinese offshore oil and gas production area
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06)In the offshore oil and gas industry, the drilling or production installations scattered in the offshore oilfields require supplies from onshore depots. These supply services are performed specially by the offshore supply ... -
Risikoeksponering for selskapet og kontraktøren ved en rammeavtale i petroleumsnæringen
(Masteroppgave/UIS-TN-IØRP/2010;, Master thesis, 2010)En utvalgt rammeavtale mellom Statoil og en leverandør vil være utgangspunktet for rapporten. Rammeavtalen omfatter marine installasjoner. En rammeavtale fastsetter vilkår for kontrakter som skal tildeles. Rapporten vil ... -
Services comparison between COSL and other oilfield services companies
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-16)By knowing about the development of COSL and analyzing the history and industry pattern, the thesis describes the difference between COSL and the three main counterparts. Recently, there are also some problems although ... -
Shoetrack drillout
(Masteroppgave/UIS-TN-IØRP/2014;, Master thesis, 2014-06-13)The petroleum industry constantly works to optimize operational aspects within drilling. The cost to drill a well is a parameter all companies want to minimize. To do this new technology and new methods are used to optimize ...