Haga, Øystein Angelskår (Masteroppgave/UIS-TN-IKM/2012;, Master thesis, 2012)
There are presently no recommended practises, defined by standards, for closing time calculation of Blow Out Preventers (BOPs), when designing BOP control systems.
As the closing time is a safety critical design parameter ...