Blar i Studentoppgaver (TN-IKM / TN-IMBM) på emneord "heavy lift removal"
Viser treff 1-1 av 1
-
Structural analysis for heavy lift removal of offshore module
(Masteroppgave/UIS-TN-IKM/2009, Master thesis, 2009)This report presents a study of the structural analysis for removal operation of the Frigg TCP2 M32 Module with a new lifting arrangement situated at the top of the M32 Module. During the removal of the M32 from the ...