• Implementation of TPM on Roxar’s three-phase closed flow loop. 

      Khodair, Mohamed Anwar (Masteroppgave/UIS-TN-IKM/2017;, Master thesis, 2017-06-15)
      This thesis demonstrates how to implement the TPM programme on Roxar’s flow loop. Roxar is a flow measurement technology company and it is a part of Emerson companies’ portfolio. Roxar's manufacturing factory is located ...
    • Life cycle cost for modification project 

      Teng, Ming Chuin (Masteroppgave/UIS-TN-IKM/2013;, Master thesis, 2013)
      Life Cycle Costing is a commonly used method for evaluating various alternatives and hence, choosing the best solution. This method is not fully utilized in the Front End Loading studies performed by one of the operating ...