Vis enkel innførsel

dc.contributor.authorLukonin, Dmitry
dc.date.accessioned2012-10-12T11:58:37Z
dc.date.available2012-10-12T11:58:37Z
dc.date.issued2012
dc.identifier.urihttp://hdl.handle.net/11250/182942
dc.descriptionMaster's thesis in Offshore Technologyno_NO
dc.description.abstractIn this master thesis the author carries out the research of the process piping integrity problems on ageing offshore installations located on the NCS in the context of M&M project activity. The author describes briefly conventional M&M projects, which are being performed on platforms and piping discipline’s role on them. The emphasis of this thesis work is placed on corrosion of process piping and pipe supports, so the typical corrosion forms for them in offshore environment are discussed, with more detailed description of corrosion under insulation and pipe support related corrosion as the two most severe and typical mechanisms of corrosion. The author presents material alternatives for process piping systems with different properties and degree of corrosion resistance, analyses performance of stainless steel and GRE piping materials as the most exploited on M&M offshore projects to withstand corrosion. Piping vibration problem is discussed in terms of modification impact on ageing piping systems. Through the case study from one of the ageing platforms the author raises the issue of lack of management attention to piping integrity problems. Then the author discusses piping system integrity barriers to withstand corrosion for all the stages of the piping system life cycle, where he underlines that the role the management is vital for the barriers’ effectiveness. By indicating on excessive focus of senior management of M&M service provider companies on financial indicators and insufficient attention to non-financial ones, the author emphasizes the importance of utilization of proper management systems, like the Balanced Scorecard, in order to achieve balanced performance of all organization’s domains. Achieving of such an organizational level ensures M&M services provider to improve rendering of services so that the effectiveness of piping system integrity barriers, carefully developed and maintained, will provide sustainable work of piping system for years. As the result the operator gets reduced OPEX of piping systems contributing to extension of economic life of the mature field.no_NO
dc.language.isoengno_NO
dc.publisherUniversity of Stavanger, Norwayno_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2012;
dc.subjectcorrosionno_NO
dc.subjectmaintenanceno_NO
dc.subjectpipe supportno_NO
dc.subjectbalanced scorecardno_NO
dc.subjectstainless steelno_NO
dc.subjectpipingno_NO
dc.subjectpiping integrity barrierno_NO
dc.subjectoffshore technologyno_NO
dc.titlePiping integrity problem of ageing installations located on the NCS under maintenance and modification projectsno_NO
dc.typeMaster thesisno_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581no_NO
dc.source.pagenumber68no_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel