Vis enkel innførsel

dc.contributor.authorTeng, Ming Chuin
dc.date.accessioned2013-09-23T12:30:49Z
dc.date.available2013-09-23T12:30:49Z
dc.date.issued2013
dc.identifier.urihttp://hdl.handle.net/11250/183030
dc.descriptionMaster's thesis in Offshore technologyno_NO
dc.description.abstractLife Cycle Costing is a commonly used method for evaluating various alternatives and hence, choosing the best solution. This method is not fully utilized in the Front End Loading studies performed by one of the operating company in cooperation with their contractor for the modification of their existing facilities in an oil field. In most of the cases, the proposed technical solutions are often chosen mainly based on the initial acquisition cost, technical compliances and previous experiences. The complete life cycle cost, which shall typically include solution integration, operation and maintenance cost are often neglected. It is important to consider the complete life cycle cost as much as possible. Without having thorough understanding of the associated cost incurred in the life cycle, it is just like viewing only the top of the iceberg by overlooking the hidden cost. The operating company aims to implement the life cycle cost calculation as part of the standard procedures while performing studies in the early phase for their modification projects. It forms a basis for selecting the best technical solutions economically. The purpose of this paper is to propose a practical solution and life cycle cost evaluation for selecting the best technical solution for modification projects. It enables the company to properly document the criteria and calculation as supporting document for decision making in the project. A practical case study is carried out and simplified LCC calculation method is proposed. It is also recommended that LCC analysis to be extended to bid evaluation while purchasing new critical equipment during the project execution phase.no_NO
dc.language.isoengno_NO
dc.publisherUniversity of Stavanger, Norwayno_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2013;
dc.subjectoffshore teknologino_NO
dc.subjectundervannsteknologino_NO
dc.subjectlife cycle costno_NO
dc.subjectmodificationno_NO
dc.subjectfront-end loading studiesno_NO
dc.subjectoperation & maintenanceno_NO
dc.subjectLCC
dc.titleLife cycle cost for modification projectno_NO
dc.typeMaster thesisno_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581no_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel