Vis enkel innførsel

dc.contributor.authorPribytkov, Evgeny
dc.date.accessioned2013-08-19T08:19:38Z
dc.date.available2013-08-19T08:19:38Z
dc.date.issued2013
dc.identifier.urihttp://hdl.handle.net/11250/183081
dc.descriptionMaster's thesis in Offshore technologyno_NO
dc.description.abstractIn this thesis, an analysis of several functioning projects has been carried out, where their specifics were thoroughly studied and conclusions made. One of the important parts of the work was devoted to the requirements to integrated template structures conceived in relevant NORSOK, ISO and DNV standards. The Main elements of Subsea Production Modules are considered in the work, their specific characteristics and components. Arctic metocean conditions that can affect selection, installation and the operational conditions of templates are analyzed. Operations and installation of subsea modules at Shtokman location are considered in the Thesis. 4 scenarios with different numbers of integrated template structures (2, 3, 4 and 6) and different numbers of wellslots in each were suggested and analyzed. For each scenario an analysis of related marine operations for the subsea modules was carried out. A program for installation cost estimates was built that enabled us to find the optimal scenario for the integrated template structures design. Various parameters affecting the cost of subsea infrastructure were analyzed and studied from different perspectives, e.g. geometrical well pattern system, the distance between drilling centers, drilling costs, etc. Risk analysis regarding the threats and consequences is also performed; risk assessment matrices and mitigation actions are established. As a result, a model for selecting an optimal Integrated Template Structure for the arctic/subarctic regions and Shtokman phase I field development was built.no_NO
dc.language.isoengno_NO
dc.publisherUniversity of Stavanger, Norwayno_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2013;
dc.subjectarcticno_NO
dc.subjectoffshoreno_NO
dc.subjectmarine operationsno_NO
dc.subjectShtokmanno_NO
dc.subjectoffshore teknologino_NO
dc.subjectsubsea engineeringno_NO
dc.subjectcost benefit analysisno_NO
dc.titleSelection of integrated template structures for the Shtokman phase I filed developmentno_NO
dc.typeMaster thesisno_NO
dc.subject.nsiVDP::Technology: 500::Rock and petroleum disciplines: 510no_NO
dc.source.pagenumber83no_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel