Vis enkel innførsel

dc.contributor.authorDevanaboyina, Ashok
dc.date.accessioned2016-09-28T11:14:27Z
dc.date.available2016-09-28T11:14:27Z
dc.date.issued2016-06-15
dc.identifier.urihttp://hdl.handle.net/11250/2411362
dc.descriptionMaster's thesis in Offshore technology: Industrial asset managementnb_NO
dc.description.abstractRecent studies reveal that the offshore projects undertaken on the Norwegian Continental Shelf failed consistently to deliver on time and budget. The study performed by Norwegian Petroleum Directorate (NPD) confirms major cost & schedule overruns. It was identified that numerous International oil and gas projects faced similar challenges in meeting the budgets and schedule. In spite of having various project management techniques, the oil companies (operators) still experience challenges to track the project deliverables. With the current lower oil prices, executing projects on time (OTD-On Time Delivery) according to the agreed budget is the need of the hour for the Norwegian oil and gas industry. This thesis looks into developing a methodology to track the projects and handles various project issues early so as to manage effective project deliveries. This study identifies various key issues that have promoted project failures in different project phases on an EPCIC project model. This thesis shows how to effectively capture the project issues and enhance overall project performance. This thesis covers various critical parameters that need to be managed in various phases of the EPCIC project. This thesis thus proposes a project evaluation methodology through using a “stage gate” criteria and also proposes a project model that could effectively manage the projects.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2016;
dc.rightsNavngivelse 3.0 Norge*
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/no/*
dc.subjectoffshore teknologinb_NO
dc.subjectdriftledelsenb_NO
dc.subjectEPCICnb_NO
dc.subjectStage Gatesnb_NO
dc.subjectPRINCE2 Project Modelnb_NO
dc.subjectindustrial asset managementnb_NO
dc.subjectproject reviewsnb_NO
dc.subjectproject failuresnb_NO
dc.subjectevaluation parametersnb_NO
dc.subjectproject evaluation templatenb_NO
dc.titleMethodology for Project Evaluationnb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel

Navngivelse 3.0 Norge
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 3.0 Norge