dc.contributor.advisorGudmestad, Ove Tobias
dc.contributor.advisorZolotukhin, Anatoly
dc.contributor.authorEgorov, Yuri
dc.coverage.spatialRussianb_NO
dc.date.accessioned2018-09-11T11:56:51Z
dc.date.available2018-09-11T11:56:51Z
dc.date.issued2018-06-14
dc.identifier.urihttp://hdl.handle.net/11250/2562046
dc.descriptionMaster's Thesis in Offshore Technology: Marine and Subsea Technologynb_NO
dc.description.abstractThis master`s thesis is dedicated to the Dolginskoye oil field development concept comprising of a gravity base structure with subsea production systems. This field is located in the central part of the Pechora Sea. The ice cover in the Dolginskoye field area is formed in September and remains until July, which seriously complicates the development process. Application of subsea production systems in such an environment enables all-year production from the field substantially reducing the risk of operations in adverse climatic conditions. One of the challenging problem is the installation process. What kind of vessels is required for the Dolginskoe area environment? Different types of vessels have been reviewed when trying to answer this question. It is known that heave is most important for vertical operations. Therefore, the heave periods are calculated and compared with the wave periods to avoid the resonance. Moreover, the load on the gravity base structure is one of the key factors in the conceptual analysis. What type of load will prevail in this environmental condition? Two types of gravity base structures were considered in this study: (1) a monopod platform with vertical walls and (2) a platform with sloped walls. For calculations, the Monte Carlo method was implemented in the MATLAB software. Different concepts of development and evaluation of reliability and quality (issues of HSE) of each of the concepts and cost-effectiveness were considered.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IMBM/2018;
dc.subjectmarine operationsnb_NO
dc.subjectmarine designnb_NO
dc.subjectinstallation of the subsea templatesnb_NO
dc.subjectwave loadnb_NO
dc.subjectice loadnb_NO
dc.subjectoffshore teknologinb_NO
dc.subjectundervannsteknologinb_NO
dc.subjectPechora seanb_NO
dc.subjectPetsjorahavetnb_NO
dc.subjectBarentshavetnb_NO
dc.titleFeasibility study of the concept of the Dolginskoye field development with subsea production systems.nb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Teknologi: 500::Marin teknologi: 580::Offshoreteknologi: 581nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel