Vis enkel innførsel

dc.contributor.authorLi, Lin
dc.contributor.authorZhu, Xinying
dc.contributor.authorParra, Carlos Andres
dc.contributor.authorOng, Muk Chen
dc.date.accessioned2022-04-21T10:07:51Z
dc.date.available2022-04-21T10:07:51Z
dc.date.created2021-12-28T17:26:40Z
dc.date.issued2021-08
dc.identifier.citationLi, L., Zhu, X., Parra, C.A., Ong, M.C. (2021) Comparative study on two deployment methods for large subsea spools. Ocean Engineering, 233, 109202en_US
dc.identifier.issn0029-8018
dc.identifier.urihttps://hdl.handle.net/11250/2991905
dc.description.abstractThe demand for subsea spool deployment is increasing with the expansion of offshore projects. For a project to install multiple spools, different deployment methods can be used. The choice of method may influence the safety and the total cost of the project. Thus, it is important to evaluate different deployment methods in the planning phase. This study addresses weather window analysis of two deployment methods for large subsea spools. The purpose is to compare the efficiency of the two methods in terms of total installation time for projects with different numbers of spools. Numerical modeling and time-domain simulations of the critical activities are carried out. The simulations together with the operational criteria provide the allowable sea states, which are the key input for weather window analysis. Hindcast data from a site in the Barents Sea are used for weather window analysis. The total installation time is compared for various months, different total numbers of spools and transportation durations. The influence of the possible increase of the allowable sea states for the critical activity on the total installation time is also evaluated. Through the comparative studies, recommendations to select the proper deployment method for different situations are provided.en_US
dc.language.isoengen_US
dc.publisherElsevier Ltd.en_US
dc.rightsNavngivelse 4.0 Internasjonal*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/deed.no*
dc.subjectundervannsteknologien_US
dc.titleComparative study on two deployment methods for large subsea spoolsen_US
dc.typePeer revieweden_US
dc.typeJournal articleen_US
dc.description.versionpublishedVersionen_US
dc.rights.holder© 2021 The Authors.en_US
dc.subject.nsiVDP::Teknologi: 500::Marin teknologi: 580en_US
dc.source.pagenumber13en_US
dc.source.volume233en_US
dc.source.journalOcean Engineeringen_US
dc.identifier.doi10.1016/j.oceaneng.2021.109202
dc.identifier.cristin1972502
cristin.ispublishedtrue
cristin.fulltextoriginal
cristin.qualitycode1


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel

Navngivelse 4.0 Internasjonal
Med mindre annet er angitt, så er denne innførselen lisensiert som Navngivelse 4.0 Internasjonal