Vis enkel innførsel

dc.contributor.authorSubbotin, Evgeny
dc.date.accessioned2015-09-15T08:56:49Z
dc.date.available2015-09-15T08:56:49Z
dc.date.issued2015-06-15
dc.identifier.urihttp://hdl.handle.net/11250/299932
dc.descriptionMaster's thesis in Offshore technologynb_NO
dc.description.abstractThere are many prospective areas to develop in Arctic and every considered project is unique. Solutions for one oil or gas field might not be appropriate for another. Especially in terms of development of oil and gas fields in the Arctic Region many issues still remain due to lack of experience and incredible harsh conditions as well as safety aspects and high-priced technological solutions. The Prirazlomnoye field is the pilot Russian Arctic project operated by company Gazprom Neft Shelf. The project covers the process of oil offloading from platform to tankers. There are some tasks to be solved in order to carry out operations safely, economically sound and professionally. Offloading represents a complex of arrangements that have to be done at appropriate time and with certain accuracy, especially in winter. Challenges that we will pay attention to are weather uncertainties, leading to waste of operation time, ice ridge formation in front of the wall of the platform in winter periods and ice drifting past the platform. Ice ridges can affect the offloading process and cargo operations. Chapter 1 provides a general description of the Prirazlomnoye field. Chapter 2 contains a brief overview of the Pechora Sea including ice conditions, wave conditions, wind, currents and tidal fluctuations. Chapter 3 contains justification of the chosen kind of oil offloading from the field. The offloading system called CUPON and tankers used for oil transportation are discussed in Chapter 4. Chapter 5 is dedicated to the offloading operation and different scenarios of offloading according to the season of year. It identifies possible threats, risks associated with the operation and gives a comprehensive understanding of tanker movements in the sea. In Chapter 6 offloading forecast and its importance will be discussed. In Chapter 7 requirements for offloading concepts and possible offloading concepts for the Pechora Sea fields will be covered. Resistance of tankers in ice during offloading is calculated in Chapter 8. Chapter 9 is devoted to safety of the offloading operations. In this chapter risk analysis and mitigation measures are carried out helping us to identify conditions for secure and feasible operations. Chapter 10 will cover the cost of offloading delays that give potential economic effect on the early stage of risk identification.nb_NO
dc.language.isoengnb_NO
dc.publisherUniversity of Stavanger, Norwaynb_NO
dc.relation.ispartofseriesMasteroppgave/UIS-TN-IKM/2015;
dc.subjectThe Prirazlomnoye fieldnb_NO
dc.subjectthe Prirazlomnaya platformnb_NO
dc.subjectDATnb_NO
dc.subjectBLSnb_NO
dc.subjectoil offloadingnb_NO
dc.subjecttankers and the CUPON systemnb_NO
dc.subjectoffloading forecastnb_NO
dc.subjectthe Pechora Sea conditionsnb_NO
dc.subjectresistance of ships in icenb_NO
dc.subjectrisk analysisnb_NO
dc.subjectHAZID analysisnb_NO
dc.subjectbow-tie diagramnb_NO
dc.subjectice managementnb_NO
dc.subjectoffloading conceptsnb_NO
dc.subjectoffshore teknologinb_NO
dc.subjectundervannsteknologinb_NO
dc.titleOil offloading solutions for the Pechora sea exemplified by the Prirazlomnoye fieldnb_NO
dc.typeMaster thesisnb_NO
dc.subject.nsiVDP::Technology: 500::Marine technology: 580::Offshore technology: 581nb_NO


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

  • Studentoppgaver (TN-IKM / TN-IMBM) [1213]
    Master- og bacheloroppgaver i Konstruksjoner og materialer / Maskin, bygg og materialteknologi (maskinkonstruksjoner, byggkonstruksjoner og energiteknologi) / Masteroppgaver i Offshore teknologi: industriell teknologi og driftsledelse - Offshore technology: industrial Asset management / Masteroppgaver i Offshoreteknologi : offshore systemer (konstruksjonsteknikk og marin- og undervannsteknologi-subsea technology)

Vis enkel innførsel