Technological scheme for the development and operation of the Leningradskoye field by the creation of a marine combined production
Master thesis
Permanent lenke
https://hdl.handle.net/11250/3084452Utgivelsesdato
2023Metadata
Vis full innførselSamlinger
Beskrivelse
Full text not available
Sammendrag
As part of the research for a master's thesis, a comprehensive analysis of the Leningradskoye gas condensate field was conducted based on existing data. The study also included an assessment of technological indicators related to the extraction and development of the deposit. A thorough analysis of various development options was carried out, taking into account technical capabilities, and the most optimal option was selected. Attention was also paid to the analysis of the stability of the platforms located on the seabed. A detailed calculation of the stability of the gravity platform was carried out to ensure its reliable operation in the marine environment.
Keywords: Kara Sea, Leningradskoye field, ice-free period, surface production, subsea production, combined production, unified mobile ice-resistant stationary platform, stability